Current Report No. 21/2014
Topic:
Signing of a significant construction contract valued at PLN 45.93m
Legal basis:
Article 56 section 1 item 2 of the Act on Public Offering – current and periodic information
Content of report:
On 9 June 2014, the Management Board of ERBUD S.A. received information about a contract for construction works signed by the Issuer with RAFAKO S.A. under the conditions as below:
1. Contract concluded on 06/09/2014
2. The Investor: Grupa Azoty Zakłady Azotowe Kędzierzyn S.A. with its registered office in 47-220 Kędzierzyn-Koźle, ul. Mostowa 30 A
3. The Customer: RAFAKO S.A, 47–400 Racibórz, ul. Łąkowa 33
4. Contract value: PLN 58,746,104.43 net
5. Contract subject: Building and engineering works, plant and equipment, services under the project “New heat and power plant in Azoty Holding – Zakłady Azotowe Kędzierzyn S.A.”.
6. Site location: Grupa Azoty Zakłady Azotowe Kędzierzyn S.A, 47-220 Kędzierzyn-Koźle, ul. Mostowa 30 A
7. Completion period: 06.06.2014 – 01.10.2016
8. Payment terms: 35 days according to the payment schedule as agreed
9. Performance Bond: 10% of the gross Contract Price for Works Range for the period of 06.06.2014 – 21.10.2016
10. Remedying Defects Warranty: 3% of the gross Contract Price for the period of 21.10.2016 – 21.10.2019 (installation of turbine generator) and 1% of the gross Contract Price for the period of 21.10.2016 – 21.10.2021
11. Other guarantees: Warranty period
– 36 months for turbine generator
– 36 months for mechanical and electrical equipment
– 60 months for construction works
– 60 months for chemical-resistant flooring
12. Penalties for the delay in timely achievement of Milestones:
1) Delivery of the coal handling plant design (basic) – 0.10% of the net Contract Price for each completed week of delay;
2) Completion of turbine generator installation – 0.10% of the net Contract Price for each completed week of delay;
3) In the event of a failure to complete the Works within the Time for Completion – 1.5% of the net Contract Price for each completed week of delay after one week waiting period.
The sum of liquidated damages shall not exceed 25% of the net Contract Price.
13. Note: The contract scope for ERBUD S.A. includes:
1) Construction and finishing works (excluding building systems):
– main building with stair-tower
– control house
– oil pump house
– pump house with distribution room
– compressor house
– cooling towers
– FGD plant (footing)
– fuel oil tank (footing)
– ash tank (footing)
– desulphurisation product tank (footing)
– sorbent tank (footing)
– ammonia solution tank (footing)
– electricity equipment house, incl. stair-tower
– elevated conveyor for slag (footing)
– slag dump
– site development works.
2) Comprehensive design and installation of the coal handling plant on a turnkey basis (incl. design, construction, technique and systems).
3) Installation of the condensing-extraction turbine generator.
ERBUD S.A. is a nominated subcontractor of Rafako S.A. approved by the Investor.