Improvements to firefighting system for Dalkia Łódź SA
Investor
Dalkia Łódź Spółka Akcyjna, 90-975 Łódź, ul. J. Andrzejewskiej 5 ul. Mostowa 30 A; 47-220 Kędzierzyn-Koźle
Date of completion
2014.01-2015.01
Location
Poland
Segment
Others
Branch
Katowice
Company
ERBUD S.A.
Scope of work
Design and build contract execution by the Consortium consisiting of ERBUD SA and ERBUD Industry Sp. z o.o. as General Contractor, including: 1. Complete construction and detail design; 2. Demolition and dismantling; 3. Construction of fire pumping station together with technological equipment, water and electrical installations and measurement, control and automation systems; 4. Retrofit of fire tanks with a capacity of 2,000 m3 with piplines and piping components, electrical installations and measurement, control and automation systems; 5. Construction of fire-water ring main by directional drilling.