Building and engineering works, including plant and equipment, under the project “New heat and power plant in the Azoty Group – Zakłady Azotowe Kędzierzyn SA”
Investor
Grupa Azoty Zakłady Azotowe Kędzierzyn S.A. ul. Mostowa 30 A; 47-220 Kędzierzyn-Koźle
Date of completion
2014.06-2016.10
Location
Poland
Segment
Power industry
Branch
Katowice
Scope of work
The contract scope for ERBUD SA includes: 1) Construction and finishing works (excluding building systems): – main building with stair-tower – control house – oil pump house – pump house with distribution room – compressor house – cooling towers – FGD plant (footing) – fuel oil tank (footing) – ash tank (footing) – desulphurisation product tank (footing) – sorbent tank (footing) – ammonia solution tank (footing) – electricity equipment house, incl. stair-tower – elevated conveyor for slag (footing) – slag dump – site development works. 2) Comprehensive design and installation of the coal handling plant on a turnkey basis (incl. design, construction, technique and systems). 3) Installation of the condensing-extraction turbine generator.